ICC Precast Bridge Kerb 915x280x280

SKU
IP000062
-5%
Special Price Rs. 3,895.48 Rs. 3,301.25 was Rs. 4,100.50
In stock

Bridge Kerbs are most probably using for bridge construction work. The kerbs always fixed in between road and bridge pedestrian path. 

Sold by ICC Precast

PRODUCT SUMMARY:

International Construction Consortium (Pvt) Ltd is the leading of manufacturer of precast concrete kerbs and
associated precast products in Sri Lanka. They are available in accordance with the RDA tandards and other standard
specifications also.
The kerbs are manufactured with high quality controlling and quality assurance systems under engineer supervision.

The Bridge kerb are used for location of both side of bridge center Island. (Please refer the general kerb data sheet)


GENERAL SPECIFICATIONS:

  • Details Specification - RDA Standard And Project Standard
  • Raw Material Specification - BS / ASTM / SLS Standard
  • Concrete Strength : 30kn/mm2
  • Curing Period (Min.) : 7 Days
  • Stacking & Packing : wooden Pallet (1200mm X1200mm)
  • Quantity for a wooden Pallet: 9 Nos.

CLIENT RESPONSIBILITIES

  • Selection of correct & required Items prior to purchase.
  • Check & get the confirmation of available stock availability before the purchase.
  • Vehicle access path should be clear.
  • Unloading should be arranged by the client.
  • If the transportation is arranged by client, vehicles should be suitable.
  • Pallet quantity for a 6 Wheel 20 feet long flatbed Vehicle: 08 Nos.
  • Pallet quantity for a 10 Wheel 23 feet long flatbed Vehicle: 10 Nos.
  • Do not stay in hazardous areas while unloading.        

 

COMPLETED PROJECTS:

 

 

PROJECT NAME 

QUONTITY

NOS.

Thirappane-Galkulama 5 Nos. Bridgers (A9 Road) 380
Southern Expressway project - Section 02/03 356
Badulla-Passara Road Bridgers Construction work 634
25 Bride Construction Project 660
Pokunuwita-Pamankada Road Construction Project ( 120 Road) 2800
Habarana - Kanthale-Thonigala Road Construction Project 890
Oyamaduwa Bridges Construction Project 1260
Outer Circular Highway Construction Project 566
Bolgoda Bridge Construction project 352
Galewela Bridge Construction Project (A6 Road) 256
 

TERMS OF SALE:

  • This price has been worked out as per the current prices of the basic material (Cement, R/F, and steel formwork) and any escalation of the basic material price to paid on actual basis.
  • The order could be confirmed by making an advance payment amounting to 75% of the total sum and the balance is to be paid before collection.
  • Return not accepted.
  • Price validity time is vary.
  • If registered, should be send the VAT/SVAT registration letter. 
Lead Time Days 14
Unit Of Measure Nos.
Weight (kg) 86.000000
Country of Manufacture Sri Lanka
Country of Origin Sri Lanka
Brand ICC
Primary Material Concrete
Colour Natural Cement Gray
Warranty Period N/A
Only registered users can write reviews. Please Sign in or create an account
More Information
Response Rate - 100%
Response Time - 9-10 Hour(s)