ICC Precast Standard Inlert Kerb 915x125x255mm
SKU
IP000743
Rs. 1,711.00
Rs. 1,450.00
In stock
ICC Precast Standard Inlert Kerb 915x125x255
Category: Precast
PRODUCT SUMMARY:
International Construction Consortium (Pvt)Ltd is the leading of manufacturer of precast concrete kerbs and
associated precast products in Sri Lanka. They are available in accordance with the RDA standars and other standard
specifications also.
The kerbs are manufactured with high quality controlling and quality assurance systems under engineer supervision.
associated precast products in Sri Lanka. They are available in accordance with the RDA standars and other standard
specifications also.
The kerbs are manufactured with high quality controlling and quality assurance systems under engineer supervision.
The Dropped kerbs are used for location of sub road access to main road. (Please refer the general kerb data sheet)
GENERAL SPECIFICATIONS:
- Details Specification - RDA Standard And Project Standard
- Raw Material Specification - BS / ASTM / SLS Standard
- Concrete Strength : 30kn/mm2
- Curing Period (Min.) : 7 Days
- Stacking & Packing : wooden Pallet (1200mm X1200mm)
- Quantity for a wooden Pallet : 15 Nos.
CLIENT RESPONSIBILITIES
- Selection of correct & required Items prior to purchase.
- Check & get the confirmation of available stock availability before the purchase.
- Vehicle access path should be clear.
- Unloading should be arranged by the client.
- If the transportation is arranged by client, vehicles should be suitable.
- Pallet quantity for a 6 Wheel 20 feet long flat bed Vehicle: 08 Nos.
- Pallet quantity for a 10 Wheel 23 feet long flat bed Vehicle : 10 Nos.
- Do not stay in hazardous areas while unloading.
COMPLETED PROJECTS:
|
|
|
PROJECT NAME |
QUONTITYNOS. |
| Central Expressway project - Section 02 | 55 |
| Southern Expressway project - Section 02/03 | 85 |
| Badulla-Passara Road Construction Project | 62 |
| Galle Road & Duplication Road Construction Project | 59 |
| Southern Road Connectivity Road Construction Project | 35 |
| Habarana - Kanthale-Thonigala Road Construction Project | 68 |
| Gogagama-Bope, Kottawa-Moragahahena Road Construction Project | 120 |
TERMS OF SALE:
- This price has been worked out as per the current prices of the basic material (Cement, R/F, and steel formwork) and any escalation of the basic material price to paid on actual basis.
- The order could be confirmed by making an advance payment amounting to 75% of the total sum and the balance is to be paid before collection.
- Return not accepted.
- Price validity time is vary.
- If registerd, should be send the VAT/SVAT registration letter.
| Lead Time Days | 14 |
|---|---|
| Unit Of Measure | Nos. |
| Weight (kg) | 55.000000 |
| Country of Manufacture | Sri Lanka |
| Country of Origin | Sri Lanka |
| Brand | ICC |
| Primary Material | Concrete |
| Colour | Natural Cement Gray |
| Warranty Period | N/A |







Log In